Cleveland, OH
Overview
Team LB performed Vertical Transportation and exterior building maintenance services for the construction documents phase of the Huntington Bank Field project, and consulted the team from schematic design through design development, construction documents and construction administration. We also performed a pedestrian simulation study of the new stadium conducted under ingress and halftime scenarios to evaluate safety, comfort, and operational efficiency. The study assessed access to seating areas, circulation through free‑flow concourses, and utilization of food and beverage facilities and restrooms.
Architect
HKS
Client
HKS

